Construction is underway at the 6th site of the 62nd Missile Division as part of the rearmament at the Sarmat missile launcher (coordinates: 55°15’58.85″N 89°45’29.37″E).

The adjoining of the construction site to the perimeter of the existing RTB zone suggests that new storage facilities for warheads are being built.

You must be logged in to post a comment.